Wire Was Cleanly Cut into the
a Fifteen Meter Long Black Wall Between the Switchboard/power Meter and the Charging Space. If Necessary, Thread the Rope Through the Penetrations in the Wall Up to a Diameter of Mm. Set Up and Test the Necessary Electrical Connections and Safety Precautions in the Charging Area. a Consumer Product with Three Optional Add-Ons. Installation of…